Subscribe       Search       Info       Help       Site Map      Feedback  
   
Volume 104 No. 4
October 2000
 
Previous TOC  Abstract Next TOC
 
 
 
 
PDF Full Text
 
 
  Current TOC  
  Past Issues  
  Prerelease TOC  
 
 
 ARTICLE
 
Building Trajan's Markets 2: The Construction Process
 
Lynne Lancaster
 
figure
Isonometric drawing for apsidal rooms E.IV.6 and E.V.6
The well-preserved state of many parts of Trajan's Markets provides the opportunity for a detailed study of the building techniques used there, which in turn sheds light on the construction process. Topics included in this paper are the planning of the drainage, design of multistory buildings with noncongruent plans, and organization and protection of the building site. They are discussed in relation to specific archaeological evidence from various parts of the Markets, such as the use of relieving arches, brick vaulting ribs, metal dowels and clamps, and travertine corbels and lintel arches. The results show that some structural and constructional elements within the building appear to have been intended to aid the construction process rather than to provide any long term functional or structural benefit. In the summary of each section, the archaeological findings presented in that section are examined in relation to broader questions dealing with the building industry, such as the use of scale drawings, the relationship between the architect and the builder, and the legal responsibility for the protection of the site during construction. Finally, two case studies involving a wider range of complexities are presented: the Aula at Trajan's Markets and the Trajanic latrine at the Forum of Caesar.
 
 
 
 

| top |
Subscribe       Search       Info       Help       Site Map      Feedback